Welcome to the Route 6 Corridor Study Home Page!

Project Background

At the request of the towns of Fairhaven, Mattapoisett, Marion, Wareham, and MassDOT District 5, the Southeastern Regional Planning and Economic Development District (SRPEDD) is embarking on a study of the Route 6 corridor due to safety concerns expressed by community officials, residents, and from Massachusetts state representatives. This study will examine the current traffic conditions, intersection operations, bicycle, pedestrian, and public transportation facilities, land uses, and overall safety of the Route 6 corridor from Route 240 in Fairhaven to High Street in Wareham. In addition, the study will include potential future improvements for the corridor based on data analyses, stakeholder input, and comments or suggestions provided by the public. 

This webpage will be your source for all information about the Corridor Study, ways to participate, and notices of upcoming workshops or events. We will keep this site updated as the planning process progresses so please plan on checking back in with us! Scroll down to see information about the Recent Updates and Upcoming Events, Elements of Study, the Interactive Map Gallery, and the Document Library.

How to Participate:

There are many ways to get involved and stay informed!

Like us on Facebook Join the Mailing List Fill out the Survey
            

 

 

 

 

 

Recent Updates

For more information, please review this website and/or contact Jed Cornock at 508.824.1367 x318. 

Elements of the Corridor Study

The Route 6 Corridor Study includes the following elements: 

1. Existing Conditions:  This component describes the current traffic conditions, intersection operations, crash history, bicycle and pedestrian facilities, environmental resources, and land uses.
2. Future Conditions:  In this section, the community describes its future land use patterns, including proposed locations for various activities such as residences, businesses, and recreation (all types of development that would increase the number of motorized and non-motorized trips on the corridor. Once that has been identified, SRPEDD staff will prepare future scenarios (growth without improvements and growth with improvements).
3. Improvements:  This part of the study involves developing projects that would improve the existing and/or future issues identified in the previous sections.
 

Interactive Maps

The interactive map below provides background information for the Route 6 Corridor Study. This map is sill under construction, please check back very soon!

Document Library (new files are posted as they become available)

The following documents provide background for the Route 6 Corridor Study. Please click on a link and be sure to follow the instructions should the file be large.
 

Plans and Reports

Fairhaven

Mattapoisett

Marion

Wareham

 

 

Website powered by Blue LAN Group's KNOWare™ CMS • Designed by Milestone